混凝土建筑物有盖重固结灌浆试验探索  被引量:3

Exploration on covered heavy consolidation grouting test of concrete buildings

在线阅读下载全文

作  者:陈佳培 任磊 向吉 CHEN Jiapei;REN Lei;XIANG Ji(Nanjing Water Conservancy Construction Engineering Co.,Ltd.,Nanjing 210000,China;China Gezhouba Group Co.,Ltd.,Wuhan 430000,China)

机构地区:[1]南京市水利建筑工程有限公司,江苏南京210000 [2]中国葛洲坝集团股份有限公司,湖北武汉430000

出  处:《水利建设与管理》2022年第3期9-14,25,共7页Water Conservancy Construction and Management

摘  要:广西大藤峡南木江副坝工程地质较为复杂,存在破碎带。为保证上部混凝土建筑物稳定及安全,提出了河床坝段岩体有盖重固结灌浆方案。在坝下0+005.00~坝下0+009.00开展生产性试验,灌浆试验后采用压水试验及抽芯检测。试验结果表明,该有盖重固结灌浆方案对南木江副坝工程复杂地质条件的处理具有可行性,可用于下一步有盖重固结灌浆施工。Guangxi Datengxia Nanmujiang Secondary Dam has complicated engineering geological conditions with fracture zones. A scheme of rock covered heavy consolidation grouting in the river bed dam section is put forward in order to ensure the stability and safety of the upper concrete building. The production test is carried out from 0+005.00 below the dam to 0+009.00 below the dam. The water pressure test and core pulling test are adopted after the grouting test. The test results show that the proposed scheme of covered heavy consolidation grouting is feasible to deal with the complex geological conditions of Nanmujiang Secondary Dam Project, and it can be used in the next stage of the covered consolidation grouting construction.

关 键 词:盖重 固结灌浆 可灌性 透水率 

分 类 号:TV651[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象