作 者:周森 黄剑慧 郝桂芹 陈秀珍 严韦 梁春慧 ZHOU Sen;HUANG Jian-hui;HAO Gui-qin;CHEN Xiu-zhen;YAN Wei;LIANG Chun-hui(Guangzhou Electric Power Engineering Design Institute Co.,Ltd,Guangzhou 510335,China)
机构地区:[1]广州市电力工程设计院有限公司,广东广州510335
出 处:《电力勘测设计》2022年第4期46-54,共9页Electric Power Survey & Design
摘 要:为解决广州市中心地区变电站因高层建筑、市政设施、历史文物等复杂环境所带来的建设难题,运用风险管理工具,建立影响变电站选址落地风险识别清单及风险可接受性评定指标,确定影响变电站选址落地的控制性风险因素。结合工程案例,提出优化站址平面布置、加强建筑防火设计、设置大跨转换结构、优化建筑结构型式、协调进出线路管廊等多项风险应对策略。In order to solve the problem of substation construction in central area of Guangzhou due to the complex environment such as high-rise buildings,municipal facilities and historical relics,risk management tools are used to determine the controlling risk factors affecting substation location by establishing the risk identification list and risk acceptability assessment index.Combined with the project case,a number of risk response strategies such as optimizing site plan layout,strengthening building fire protection design,setting up large-span transfer structure,optimizing building layout and structure type,coordinating incoming and outgoing pipe gallery lines are put forward.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171