检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邴李峰 Bing Lifeng(The Seventh Operation Area of The Sixth Oil Production Plant of Daqing Oilfield,Heilongjiang Daqing 163000)
机构地区:[1]大庆油田第六采油厂第七作业区,黑龙江大庆163000
出 处:《石化技术》2022年第2期14-15,共2页Petrochemical Industry Technology
摘 要:北东块一区二套是喇嘛甸油田第二个二类B油层工业化聚合物驱推广区块,2017年6月注聚,地面采用单泵单井注入工艺,注聚泵排量采用变频闭环恒流控制。随着注聚时间的推移,由于注聚泵配件磨损、损坏等原因,泵效逐渐降低,变频会自动升高使流量达到方案瞬时,柱塞的加速运动会增加对聚合物母液的机械剪切力、同时增加注聚能耗。The second set of block I in Northeast block is the second industrialized polymer flooding promotion block of class II oil layer B in Lamadian oilfield,For polymer injection in June 2017,single pump and single well injection process was adopted on the ground,and the displacement of polymer injection pump was controlled by frequency conversion closed-loop constant current.With the lapse of polymer injection time,due to wear and damage of polymer injection pump accessories,The pump efficiency decreases gradually,and the frequency conversion will automatically increase,so that the flow reaches the instantaneous value of the scheme,The accelerated movement of the plunger will increase the mechanical shear force on the polymer mother liquor and increase the energy consumption of polymer injection.
分 类 号:TE357.46[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.24