检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑海旺 张昊 王平 Zheng Haiwang;Zhang Hao;Wang Ping(Chuanqing Drilling Engineering Co.,LTD.,Changqing Downhole Technology Operation Company Oil and Gas Well Workover Brigade,Xianyang Shanxi 712000)
机构地区:[1]川庆钻探工程有限公司长庆井下技术作业公司油气井修井大队,陕西咸阳712000
出 处:《石化技术》2022年第2期84-85,共2页Petrochemical Industry Technology
摘 要:随着气井带压作业新技术的提高,气井带压作业技术得到广泛应用。它最大限度地保持了产层的原始状态、提高产能和采收率,但也可能发生油管内堵塞失效、水合物、卡瓦失效、油管落井、飞出、弯曲、拉断等风险,尤其天然气井水合物的影响最为严重,本文通过水合物形成的原因、产生的危害以及控制消减措施,有效防止带压作业井筒内冰堵的产生。With the improvement of pressure operation technology,pressure operation technology of gas well has been widely used.It maximally keep the original state of reservoir,increase production capacity and recovery ratio,but may also occur within the tubing plugging failure,hydrate,slip,tubing fall well,fly out,bending,tensile,such as risk [1],especially the influence of gas well hydrate is most serious,in this paper,the causes of the formation of hydrate,the harm and control cutting,Effectively prevent the production of ice blocking in the wellbore with pressure.
分 类 号:TE37[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62