综合监控系统接入控制中心的方案研究——以南宁地铁2号线东延线为例  

Research on the Scheme of Integrated Monitoring System Access to Control Center——Taking the East Extension of Nanning Metro Line 2 as an Example

在线阅读下载全文

作  者:尉怀亮 WEI Huailiang(China Railway 11th Bureau Group Electrical Engineering Co.,Ltd.,Wuhan 430074,China)

机构地区:[1]中铁十一局集团电务工程有限公司,湖北武汉430074

出  处:《通信电源技术》2021年第21期173-176,共4页Telecom Power Technology

摘  要:介绍了在建南宁地铁2号线东延线综合监控系统(Integrated Supervisory Control SystemISCS)接入原有已运行系统的贯通方案,详细分析了接入前既有网络、在建南宁2号线东延线的网络和接入贯通后的网络情况,阐述了网络贯通接入前置条件,给出了具体的贯通接入方案和实施步骤,并提出在不影响既有运营线路的情况下的风险控制方法,为国内在建的同类型延长线接入工程提出了建设性的思路。This paper introduces the connection scheme of the Integrated Supervisory Control System(ISCS)of the East extension line of Nanning Metro Line 2 under construction to the original operating system,analyzes in detail the existing network before connection,the network of the East extension line of Nanning Metro Line 2 under construction and the network after connection,expounds the preconditions for network connection,and gives the specific connection scheme and implementation steps,It also puts forward the risk control method without affecting the existing operation lines,and puts forward constructive ideas for the same type of extension line access project under construction in China.

关 键 词:综合监控系统(ISCS) 贯通接入 控制中心 

分 类 号:TP3[自动化与计算机技术—计算机科学与技术]

 