检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄健[1] Huang Jian(Jiangsu Qi’an Construction Group Co.,Ltd.,Qidong 226200,Jiangsu Province,China)
机构地区:[1]江苏启安建设集团有限公司,江苏启东226200
出 处:《建筑与装饰》2022年第7期144-146,共3页Construction & Decoration
摘 要:传统的机电安装工作,主要依据所设计的二维图纸进行,灵活度不足,极易受到施工环境、经费预算、人员变更等因素的影响,安装失误无法进行调整。而通过BIM(Building Information Modeling,建筑信息模型)技术的应用,能够全面提升机电安装工作效率,对各环节进行仔细检查,依据安装经验进行灵活应变,机电安装整体质量与效率都能得到保证。The traditional electromechanical installation work is mainly carried out according to the designed twodimensional drawings,which has insufficient flexibility and is easily affected by factors such as construction environment,fund budget and personnel changes,and installation errors cannot be adjusted.Through the application of BIM(Building Information Modeling)technology,the efficiency of electromechanical installation can be improved comprehensively and careful inspection of each link is performed,flexible adaptation is allowed based on installation experience,and overall quality and efficiency of electromechanical installation can be guaranteed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170