检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹慷峰 CAO Kangfeng(Shanxi Huaye Survey Engineering Technology Co.,Ltd.,Taiyuan 030002,China)
机构地区:[1]山西华冶勘测工程技术有限公司,山西太原030002
出 处:《粘接》2022年第3期96-100,共5页Adhesion
摘 要:针对传统桩基水平承载力分析方法对土体参数的要求,提出采用岩土工程原位测试中的p-y曲线法对桩基水平承载力进行分析。在软土地基上对两根钻孔灌注桩进行有限元模拟,同时采用p-y曲线对钻孔灌注桩的水平承载力进行分析,结果表明:在水平荷载下,p-y曲线法能有效计算桩身水平位移、截面弯矩和土体抗力;p-y曲线计算结果与有限元数值模拟结果具有很高的拟合度,可有效反应不同土质下桩基的水平承载力变化。In view of the high requirements of soil parameters and high cost of traditional pile foundation horizontal bearing capacity analysis method,the p-y curve method based on geotechnical engineering in-situ testing technology is proposed to analyze the horizontal bearing capacity of pile foundation.Through the finite element simulation of two bored piles of a building on soft soil foundation,the results are compared with the results of p-y curve method based on geotechnical engineering in-situ testing technology proposed in this paper.It is proved that the p-y curve method based on in-situ test of geotechnical engineering proposed in this paper can effectively calculate the horizontal displacement of pile body,section bending moment and soil resistance under horizontal load;the calculation results have a high degree of fit with the finite element numerical simulation results,and can effectively reflect the changes of horizontal bearing capacity of pile foundation under different soil conditions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49