检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈斐 Chen Fei(ZYF Construction Group Co.,Ltd.,Suzhou 215000,China)
机构地区:[1]中亿丰建设集团股份有限公司,江苏苏州215000
出 处:《科学技术创新》2022年第11期169-172,共4页Scientific and Technological Innovation
摘 要:随着城市道路建设不断发展,新建成的高架越来越多,与现状道路上跨交叉,势必存在交叉部分的道路净空不够的问题。解决净空高度需要将原道路进行下挖处理,而此带来的问题是原道路雨水系统作废无法使用,需要新建泵站来提升排放该下挖部分的道路雨水。本文以苏州娄门下穿道路改造为例,介绍了下穿道路改造时雨水管网如何设计,为以后同类型道路改造提供一定的参考。With the continuous development of urban road construction, more and more overhead roads were newly built, which are crossed with the existing roads. Therefore, we have the problem of insufficient road clearance in the crossing part. To solve the problem of clearance height, we should excavate the original roads, but it may lead to the problem that the rainwater system of the original road is invalid and cannot be used. We need a new pump station to improve and discharge the rainwater of the excavated part of the road. Taking the reconstruction of Loumen underpass road in Suzhou as an example, this paper introduces how to design the rainwater pipe network during the reconstruction of Underpass road, which provides a certain reference for the reconstruction of the same type of roads in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38