作 者:吴帮玉 WU Bang-yu(China Railwag No.2 Engineering Group Co.,LTD,Chengdu 610091 China)
机构地区:[1]中铁二局第五工程有限公司,四川成都610091
出 处:《铁路工程技术与经济》2022年第1期44-47,共4页Railway Engineering Technology and Economy
摘 要:铁路工程建设正推行单价承包合同。本文以分析铁路工程单价承包合同责任主体风险分担原则为切入点,以水泥、钢筋、油料及火工品等材料为代表分析单价承包合同材料价差调整风险分担情况,在进一步分析单价承包合同价差风险分担与行业现行文件差异的基础上,提出铁路工程单价承包合同材料价差风险合理分担的思路,希望能为制定单价承包合同模式下的投资控制配套政策提供参考。The unit price contract is being used within railway construction.This paper analyzes the risk sharing principle of the responsible subject of the railway project unit price contract,and analyzes the risk sharing situation of material price difference adjustment in the unit price contract with cement,steel bar,oil and explosive materials as representatives.On the basis of further analysis of the difference between the risk sharing and the existing document,this paper puts forward the idea of reasonable risk sharing of material price difference in railway project unit price contract,and hoping to provide reference for formulating the supporting policies of investment control under the unit price contract model.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.145.200