检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏鹏琳 郭春生 彭琛 WEI Penglin;GUO Chunsheng;PENG Chen(SGIDI Engineering Consulting(Group)Co.,Ltd.,Shanghai 200093,China)
机构地区:[1]上海勘察设计研究院(集团)有限公司,上海200093
出 处:《河南科技》2022年第6期77-79,共3页Henan Science and Technology
摘 要:平面联系测量是指导盾构推进的重要环节,实际工程中采用两井定向进行施测。常用的测量方法包括直接导线法与吊钢丝法,笔者采用上述两种方法在佛山市深电区间进行联系测量,测量后统计两种方法的消耗对比,总结两种方法适应的场景。Plane contact measurement is an important link to guide shield propulsion. In practice, two wells are used for directional measurement. The common measurement methods include direct conductor method and hanging wire method, The author use the above two methods to measure the connection between the deep electric power sections in Foshan City. After the measurement, the consumption comparison between the two methods is calculated and the scenarios suitable for the two methods are summarized.
分 类 号:U239.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147