检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Kaka Sanaullah Mingchao Xia Mazhar Hussain Sharafat Hussain Ammar Tahir
机构地区:[1]the School of Electrical Engineering,Beijing Jiaotong University,Beijing 10044,China [2]the School of Computer and Information Technology,Beijing Jiaotong University,Beijing 10044,China
出 处:《CSEE Journal of Power and Energy Systems》2022年第2期599-608,共10页中国电机工程学会电力与能源系统学报(英文)
基 金:This work was supported in part by the National Natural Science Foundation of China(No.51677003)。
摘 要:Power systems can suffer outages,causing complete or partial disconnection of their power supply to load centers within the distribution networks.Distributed Generation(DG)plays an essential role in power systems.DG can be used as a back-up power source to enhance the resiliency and reliability of a power system.Island mode operations after outages in an active distributing network(ADN)is an effective way to maintain continuity of the power supply to significant loads.It is a quite complicated task for power system operators to find the power flow path.Previous studies have primarily used pre-defined guidelines to find feasible power flow paths,and have focused on multiple islands for restoration.In these studies,possible restoration pathfinding with DG was the fundamental weakness,and furthermore,the power of DG was limited to pre-defined boundaries in the form of islands.Therefore,in this study,a new algorithm has been proposed,which uses the minimum spanning tree(MST)method to find the most feasible path.The proposed algorithm starts at any random node(in this case,DG),and progresses by selecting the next node with the least cost(weight),thus considering all the nodes through which power will flow.The proposed model is formulated as a multiobjective program considering the priority of loads and minimum power loss.The effectiveness of the proposed model is tested on a modified IEEE69-bus distribution system with the penetration of multiple distributed generation sources at different nodes.Results were compared with the strategies found in literature,and the proposed method was found to be feasible and efficient.
关 键 词:Active distribution network distributed generation ISLANDING MULTI-OBJECTIVE minimum spanning tree
分 类 号:TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229