检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:翁斌 廖金杭 阙云[1] WENG Bin;LIAO Jinhang;QUE Yun(School of Civil Engineering,Fuzhou University,Fuzhou 350116,China)
出 处:《路基工程》2022年第2期69-73,共5页Subgrade Engineering
摘 要:以福建省某工程为依托,在现场埋设加速度传感器,分别从X, Y, Z三个方向来研究道路夯实机振动工作时对周围环境的影响。分别测试了三大类情况HHT-8四个夯实档位,测试1未设置隔震沟,测试2和测试3设置了不同尺寸的隔震沟。结果表明:设置隔震沟后,随着距离的增加,加速度响应先减小后在距隔震沟3 m处回弹后再次衰减;设置隔震沟能够有效地减小加速度响应,但隔震沟尺寸增加较小时,对加速度响应减小效果不明显;提出了不同档位下的施工安全距离。Based on a project in Fujian Province, the impact of the road rammer vibration work on the surrounding environment was studied from the three directions of X, Y, Z respectively by using the accelerometer embedded in the field. The HHT-8 under the four rammed gears with three situations were tested respectively. No isolation ditch was set in test 1, while isolation ditches of different sizes were set in test 2 and test 3. The results show that with the increase of distance, the acceleration response decreases first and then attenuates again after a rebound 3 m away from the isolation ditch. The acceleration response can be effectively reduced by setting isolation ditch, but the effect is not obvious when the size of isolation ditch is small. The safe distances of construction with and without isolation ditch under different gears have been put forward.
关 键 词:HHT-8强夯法 振动 隔震沟 加速度 安全距离
分 类 号:U416.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.177