检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孟令轩 边明远 何洪强 彭丙翔 宋福成 Meng Lingxuan;Bian Mingyuan;He Hongqiang;Peng Bingxiang;Song Fucheng(Decoration Engineering Co.,Ltd.,China Construction First Bureau Group,Beijing,100161)
机构地区:[1]中建一局集团装饰工程有限公司,北京100161
出 处:《建设科技》2022年第5期26-29,共4页Construction Science and Technology
摘 要:复合垂直流人工湿地工程,是近年来城市山水林田湖草生态保护修复工程的重要组成部分。人工湿地工程一般含概多个湿地单元池,各湿地单元池由钢筋混凝土隔墙、集配水管道及滤料、水生植物等组成。本文对湿地单元池滤料碎石层内管道嵌敷施工关键技术进行阐述,着重介绍嵌敷支架的研制、使用及管道嵌敷要点等。The composite vertical flow constructed wetland project is an important part of the ecological protection and restoration project of urban landscapes, forests, fields, lakes and grasses in recent years, which. The constructed wetland project generally contains a number of wetland unit pools., eEach wetland unit pool is composed of reinforced concrete partition wall, water collection and distribution pipes and filter materials, aquatic plants, etc. This paper expounds the key technologies of pipeline embedding in the gravel layer of the filter material of the wetland unit pool, focusing on the development, use and pipeline embedding of the inlay bracket.
分 类 号:X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.203.168