检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑艳 金鑫[2] 侯林锋[1] 余小柳 ZHENG Yan;JIN Xin;HOU Lin-feng;YU Xiao-liu(Department of Information Engineering in Surveying Mapping Science and Remote Sensing,Guangdong Polytechinc of Industry and Commerce,Guangzhou Guagndong 510510,China;Beijing Urban Construction Exploration&Surveying Design Research Institute Co.,Ltd,Beijin 100101,China)
机构地区:[1]广东工贸职业技术学院测绘遥感信息学院,广东广州510510 [2]北京城建勘测设计研究院有限责任公司,北京100101
出 处:《地矿测绘》2022年第1期9-15,共7页Surveying and Mapping of Geology and Mineral Resources
基 金:广东省教育厅2021年度广东省普通高校特色创新类项目“新建地铁隧道下穿典型环境单元施工风险识别与监测分析研究”(2021KTSCX207);广东工贸职业技术学院2021年院级“自然科学类研究项目”科研项目(2021-zk-19);广东工贸职业技术学院2021年“双高专业群建设委托专项”科研项目(2021-zx-08)。
摘 要:随着地铁建设的加快,地铁既有车站和区间隧道在运营过程中容易受到周边施工的影响,对地铁运营安全造成威胁。为保证地铁的安全运营,就要在地铁保护区范围内进行地铁运营监测。地铁的运营监测对时效性和监测频率要求都比较高,传统的监测手段无法满足地铁运营实时监测需求。据此,文章采用测量机器人和静力水准自动化监测两种不同方法对既有换乘车站进行监测,并将两者的监测数据进行对比分析。结果表明,采用自动化监测技术手段能够对既有地铁结构变形实施实时有效监控,相关单位也能够根据监测结果及时调整施工参数及措施,保证施工期间既有地铁线路的安全运营。With the acceleration of subway construction,the existing subway stations and section tunnels are easily influened by surrounding construction during operation period,which is harmful for the safety of subway operation.In order to ensure the safe operation of the subway,it is necessary to carry out subway operation monitoring within the subway protection area.The subway operation monitoring requires high timeliness and monitoring frequency.The traditional monitoring methods can not meet the real-time monitoring needs of subway operation.In this paper,two different methods,measuring robot and static leveling automatic monitoring,are used to monitor the existing transfer station,and the monitoring data of the two are compared and analyzed.The results show that the automatic monitoring technology can effectively monitor the structural deformation of the existing subway in real time,and the relevant units can timely adjust the construction parameters and measures according to the monitoring results to ensure the safe operation of existing subway line during construction period.
分 类 号:U456.3[建筑科学—桥梁与隧道工程] TU196[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229