双肢薄壁高墩施工液压自爬模设计研究  被引量:3

Research on the Design of Hydraulic Self-climbing Formwork for the Constructionof Thin-walled High Piers with Double Limbs

在线阅读下载全文

作  者:许林军 XU Lin-jun(China Railway 25th Bureau Group Second Engineering Co.,Ltd.,Nanjing 210046,China)

机构地区:[1]中铁二十五局集团第二工程有限公司,南京210046

出  处:《价值工程》2022年第13期143-145,共3页Value Engineering

摘  要:随着桥梁设计技术、施工工法的发展与进步,桥梁各种类型的高墩日渐增多。液压自爬模板系统因砼表面外观质量好;设置液压自爬装置,使模板及架体能自行爬升,无需配备其它起重设备,节约成本;施工速度快等优势,在高墩施工中得到了广泛使用。本文结合洞坡岭大桥双肢薄壁高墩的施工实践,对液压自爬升模板系统的设计、施工要点进行了详细的阐述,以期为该工法的设计技术及施工管理的进步提供些许借鉴。With the development and progress of bridge design technology and construction method,various types of high piers are increasing day by day.The hydraulic self-climbing formwork system has the advantages of good concrete surface appearance;hydraulic self-climbing device is set up,so that the formwork and the frame body can climb by themselves,without the need for other lifting equipment,which saves costs;the construction speed is fast and other advantages,it has been widely used in the construction of high piers use.Combined with the construction practice of thin-walled high piers with double limbs of Dongpoling Bridge,this paper expounds the design and construction points of hydraulic self-climbing formwork system in detail,in order to provide some reference for the progress of design technology and construction management of this construction method.

关 键 词:双肢薄壁高墩 液压自爬模 系统设计 施工要点 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象