检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:许林军 XU Lin-jun(China Railway 25th Bureau Group Second Engineering Co.,Ltd.,Nanjing 210046,China)
机构地区:[1]中铁二十五局集团第二工程有限公司,南京210046
出 处:《价值工程》2022年第13期143-145,共3页Value Engineering
摘 要:随着桥梁设计技术、施工工法的发展与进步,桥梁各种类型的高墩日渐增多。液压自爬模板系统因砼表面外观质量好;设置液压自爬装置,使模板及架体能自行爬升,无需配备其它起重设备,节约成本;施工速度快等优势,在高墩施工中得到了广泛使用。本文结合洞坡岭大桥双肢薄壁高墩的施工实践,对液压自爬升模板系统的设计、施工要点进行了详细的阐述,以期为该工法的设计技术及施工管理的进步提供些许借鉴。With the development and progress of bridge design technology and construction method,various types of high piers are increasing day by day.The hydraulic self-climbing formwork system has the advantages of good concrete surface appearance;hydraulic self-climbing device is set up,so that the formwork and the frame body can climb by themselves,without the need for other lifting equipment,which saves costs;the construction speed is fast and other advantages,it has been widely used in the construction of high piers use.Combined with the construction practice of thin-walled high piers with double limbs of Dongpoling Bridge,this paper expounds the design and construction points of hydraulic self-climbing formwork system in detail,in order to provide some reference for the progress of design technology and construction management of this construction method.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.107.82