220kV高压架空线下地连墙施工安全控制措施  被引量:2

Safety Management and Control Measures for Underground Wall Construction under 220kVHigh-voltage Overhead Line

在线阅读下载全文

作  者:金明 JIN Ming(Nanjing Metro Construction Co.,Ltd.,Nanjing 210000,China)

机构地区:[1]南京地铁建设有限责任公司,南京210000

出  处:《价值工程》2022年第14期54-56,共3页Value Engineering

摘  要:南京地铁7号线某车站部分地下连续墙施工受到220kV架空高压线影响,本文主要从施工方案确定、机械设备的选择与改造、施工过程技术与质量管理、安全管控措施等方面,详细叙述邻近架空高压线下地连墙施工的关键控制要点。通过本次顺利实施地连墙施工的案例,为以后类似工况条件的地连墙施工提供成功的经验。The construction of underground diaphragm wall in a station of Nanjing Metro Line 7 is affected by 220kV overhead high-voltage line.This paper mainly describes the key control points of underground diaphragm wall construction under adjacent overhead high-voltage line from the aspects of construction scheme determination,selection and transformation of mechanical equipment,construction process technology and quality management,safety control measures and so on.Through the successful implementation of the diaphragm wall construction case,it provides successful experience for the diaphragm wall construction under similar working conditions in the future.

关 键 词:邻近架空 高压线 钢筋笼 连续墙 成槽 龙门吊 起重吊装 安全控制 

分 类 号:U443.164[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象