检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩娟 HAN Juan(China Railway Seventeen Bureau Group Third Engineering Co.,Ltd.,Shijiazhuang 050081,China)
机构地区:[1]中铁十七局集团第三工程有限公司,石家庄050081
出 处:《价值工程》2022年第15期67-69,共3页Value Engineering
摘 要:本文介绍了跨国道互通立交施工。通过对互通立交跨国道节点方案设计,制定三处跨国道匝道桥施工方案并进行经济性比选。根据不同位置及墩身高度制定了盘口支架+螺旋管支架结合的现浇方案。根据工期安排,控制周转材料投入,降低施工成本。分析了互通立交节点施工方案对立项投标、施工准备、组织施工、竣工验收全过程的影响因素。为公路工程中跨繁忙国道复杂条件下互通立交施工提供参考。This paper introduces the construction of interchange across national highway.Through the scheme design of interchange crossing national highway nodes,the construction schemes of three transnational ramp bridges are formulated and compared economically.According to different positions and pier body height,the cast-in-situ scheme of the combination of coil support and spiral pipe support is formulated.According to the schedule,control the input of revolving materials and reduce the construction cost.This paper analyzes the influencing factors of interchange node construction scheme on the whole process of project approval and bidding,construction preparation,construction organization and completion acceptance.It provides a reference for the construction of interchange under complex conditions across busy national highways in highway engineering.
分 类 号:U442.54[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.141.165.89