检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:万利台 黄立财 WAN Litai;HUANG Licai(Guangdong Hydropower Planning &Design Institute Co., Ltd., Guangzhou 510635, China)
机构地区:[1]广东省水利电力勘测设计研究院有限公司,广州510635
出 处:《广东水利水电》2022年第4期59-64,共6页Guangdong Water Resources and Hydropower
摘 要:抽水蓄能电站大多水头较高,输水管道长度较长,其高压隧洞采用不同的衬砌形式对工程安全和工程造价有着较大的影响,因此,隧洞衬砌形式的选择尤为重要。抽水蓄能电站高压隧洞常用的衬砌形式主要有钢筋混凝土衬砌和钢板衬砌2种。该文结合云霄抽水蓄能电站的水文地质条件,吸收已建工程的成功经验,通过技术经济比选,最终选定采用钢筋混凝土衬砌形式。Most of the pumped storage power stations have high water heads and long water pipelines.Different lining types of high-pressure tunnels have great influence on engineering safety and cost,so the selection of tunnel lining types is particularly important.The common lining types of high pressure tunnel in pumped storage power station are mainly reinforced concrete lining and steel plate lining.Combined with the hydrogeological conditions of Yunxiao pumped storage power station,absorbing the successful experience of existing projects,and through technical and economic comparison,the reinforced concrete lining scheme is finally selected in this paper.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.149.7.172