喀群一级水电站压力前池排冰排沙设计与试验研究  

Design and test of pressure forebay ice and sediment discharge for Kaqun Cascade Ⅰ Hydropower Station

在线阅读下载全文

作  者:崔忠[1] 石嵚[1] CUI Zhong;SHI Qin(Xinjiang Water Conservancy and Hydropower Survey,Design and Research Institute Co.,Ltd.,Urumqi 830000,China)

机构地区:[1]新疆水利水电勘测设计研究院有限责任公司,乌鲁木齐830000

出  处:《广西水利水电》2022年第2期11-14,共4页Guangxi Water Resources & Hydropower Engineering

摘  要:在喀群一级电站压力前池设计中,针对压力前池排冰排沙要求,结合水力学模型试验,通过对压力前池布置不断进行优化,最终确定采用正向排冰、侧向引水布置,排冰闸布置在引水渠末端,压力前池上游,冬季排冰运行时利用上层水排冰,引下层水发电,在进水室前端布置排沙涡管。经过多年运行,运行效果较好。During the design of pressure forebay of Kaqun Cascade I Hydropower Station, in view of the requirements for ice and sediment discharge, combined with hydraulic model test, the forebay layout was constantly optimized.The finally determined scheme is forward ice discharge and lateral water diversion. The ice discharge gate is arranged at the end of diversion channel and upstream of forebay. In the winter, the water of upper layer is used to discharge ice and the water of lower layer is used for power generation. The sediment discharge vortex tube is arranged at the head of water inlet chamber. Multiple years of operation has proved good effects of design.

关 键 词:压力前池 正向排冰 分层引水 排沙涡管 喀群一级电站 

分 类 号:TV737[水利工程—水利水电工程]

 