地下厂房桥式布料机系统设计与研究  

Design and study of bridge distributing machine system for underground powerhouse

在线阅读下载全文

作  者:陈学永 CHEN Xue-yong(China Gezhouba Group Construction Engineering Co.,Ltd.,Kunming 650217,China)

机构地区:[1]中国葛洲坝集团建设工程有限公司,昆明650217

出  处:《广西水利水电》2022年第2期81-85,共5页Guangxi Water Resources & Hydropower Engineering

摘  要:乌弄龙水电站地下厂房长117 m,跨度24.5 m。共布置4台单机容量为247.5 MW的水轮发电机组。4台机组段的肘管、蜗壳及机墩风罩混凝土约为5.8万m^(2),在地下厂房混凝土施工的同时,交叉进行机电安装作业。为解决混凝土入仓手段及与机电安装干扰的问题,设计了一种新型的地下厂房桥式布料机,主要用于主厂房1#~4#机、高程1 795.5~1 812.5 m范围内的混凝土浇筑施工。The underground powerhouse of Wunonglong Hydropower Station dimensioning 117m-long and 24.4mwide accommodate four turbine generator units each with a capacity of 247.5MW. The concrete quantity of elbow tube, spiral case and unit hood is about 58 000 m^(2). During the concreting construction of underground powerhouse,mechanical and electrical installation will be conducted at the same time. In order to solve the interference between concrete placing and electro-mechanical installation, a new type bridge distributing machine was designed for the concreting construction of main powerhouse within the scope of No.1~No.4 unit section and at EL. 1795.5~1812.5m.

关 键 词:桥式布料机 上料胶带输送系统 供料胶带输送系统 布料胶带输送系统 电气控制系统 

分 类 号:TV731.6[水利工程—水利水电工程] TV544

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象