摘 要:传统火电厂建设一般是将脱硫、脱销等多个工序的施工生产车间单独进行建设,不仅带来了占用土地多,管理和运行费用高的缺陷,分散的生产车间也降低了火电厂的发电的生产效率。本文对于火电厂发电程序的一体化建设提出了建议,并通过对国内外建设方案的分析,对于我国未来的一体化火电厂建设进行了探讨。The construction of traditional thermal power plants generally involves separate construction of the construction and production workshops of multiple processes such as desulfurization and out-of-stock,it caused the defects of large land occupation and high management and operating costs,the scattered production workshops have also reduced the production efficiency of thermal power plants.This article proposes suggestions for the integrated construction of power generation procedures in thermal power plants,and through the analysis of domestic and foreign construction plans,the future construction of integrated thermal power plants in my country was discussed.
分 类 号:X701[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28