检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:穆娜娜[1] 查国清[2] 胥旋[1] MU Nana;ZHA Guoqing;XU Xuan(Beijing Key Laboratory of Metro Fire and Passenger Transportation Safety,China Academy of Safety Science and Technology,Beijing 100012,China;School of Reliability and Systems Engineering,Beihang University,Beijing 100083,China)
机构地区:[1]中国安全生产科学研究院地铁火灾与客流疏运安全北京市重点实验室,北京100012 [2]北京航空航天大学可靠性与系统工程学院,北京100083
出 处:《中国安全生产科学技术》2022年第3期199-203,共5页Journal of Safety Science and Technology
基 金:国家自然科学基金项目(71774148)。
摘 要:为研究导流栏杆设置对地铁岛式站台人员疏散效率的影响,选取不同出口分布类型的地铁岛式站台为研究对象,基于BuildingEXODUS软件进行数值模拟,分析导流栏杆设置对不同出口分布类型地铁岛式站台人员疏散的影响。研究结果表明:A型站台在设置导流栏杆后,人员疏散时间均有所增加,导流栏杆设置长度为2,4 m时,人员疏散时间增幅较小,导流栏杆设置长度为6,8,10 m时,人员疏散时间增幅较大;B型站台在设置导流栏杆后,相同疏散人数时,随着导流栏杆长度的增加,人员疏散时间呈先减小后增大的趋势,且导流栏杆设为4 m时人员疏散时间最短;C型站台设置导流栏杆后人员疏散时间变化不大;相比C型站台,A,B型站台的人员疏散效率更易受导流栏杆设置的影响。研究结果可为地铁客流组织和运营安全提供参考。In order to study the influence of the setting of diversion railing on the personnel evacuation efficiency of subway island platform,the subway island platforms with different types of exits distribution were selected as the research objects,and the numerical simulation was carried out based on BuildingEXODUS software to analyze the influence of the setting of diversion railing on the personnel evacuation efficiency of subway island platform with different types of exits distribution,so as to provide reference for the subway passenger flow organization and operation safety.The results showed that for the type A platform,the personnel evacuation time increased after the setting of diversion railing,and the increase of personnel evacuation time was smaller when the length of diversion railing was 2 m and 4 m,while when the length of diversion railing was 6 m,8 m and 10 m,the increase of personnel evacuation time was larger.For the type B platform after the setting of diversion railing,the personnel evacuation time decreased first and then increased with the increase of the length of diversion railing under the same number of evacuation personnel,and the personnel evacuation time was the shortest when the diversion railing was set as 4 m.For the type C platform after the setting of diversion railing,there was little change in the personnel evacuation time.Compared with the type C platform,the personnel evacuation efficiencies of type A and type B platforms were more susceptible to the setting of diversion railing.
分 类 号:X951[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15