暗挖车站洞内地下连续墙施工地层效应分析  被引量:1

Stratum Effect of Diaphragm Wall Construction with Pile-beam-arch Method

在线阅读下载全文

作  者:薛洪松 朱雅倩 张志红[2] 姚爱军[2] 刘希胜 杜昌隆 XUE Hong-song;ZHU Ya-qian;ZHANG Zhi-hong;YAO Ai-jun;LIU Xi-sheng;DU Chang-long(Beijing Construction Engineering Group, Beijing 100055, China;The Key Laboratory of Urban Security and Disaster Engineering, Ministry of Education, Beijing University of Technology, Beijing 100124, China)

机构地区:[1]北京建工集团有限责任公司,北京100055 [2]北京工业大学,城市与工程安全减灾教育部重点实验室,北京100124

出  处:《科学技术与工程》2022年第7期2878-2886,共9页Science Technology and Engineering

基  金:国家自然科学基金重点项目(51538001)。

摘  要:地下水资源对经济社会的可持续发展具有十分重要的作用。为了拥护国家对水资源的保护政策,北京地铁16号线在施暗挖车站——看丹站首次尝试以导洞内地下连续墙替换传统边桩施工的方式,以期达到承载和止水的双重目的。虽然施作的试验段取得了较好的效果,但北京地区地层复杂,局促低矮空间内的洞内地连墙施工能否大范围顺利推广实施仍存在争议。以北京地铁16号线看丹站、首都机场西沿线北新桥站和北京地铁7号线广渠门外站为代表,采用Midas软件对边导洞内地下连续墙施工过程进行数值模拟,揭示北京地区砂卵石、粉质黏土和砂卵石-粉质黏土互层三种典型地层条件下洞内地下连续墙施工诱发的环境响应。结果表明:①在其他条件相同的情况下,砂卵石地层中地下连续墙施工引起的地表沉降值最小,粉质黏土地层地下连续墙施工引起的地表沉降值最大;②洞内地下连续墙施工引起导洞拱顶沉降值大小排序为:砂卵石地层<砂卵石-粉质黏土互层地层<粉质黏土地层;③相比于砂卵石-粉质黏土互层地层及粉质黏土地层,砂卵石地层条件下,洞内地下连续墙施工引起的围岩塑性应变值及应变范围最小,对周围土体扰动较小。Groundwater resources play a very important role for the sustainable development of economy and society.In order to comply with the national water resources protection policy,the traditional side pile construction method has been replaced by underground diaphragm wall in the excavation station(Kandan Station)of Beijing Metro Line 16,so as to achieve the dual purpose of bearing and sealing.Although the test section of construction has achieved good results,there is still controversy whether the diaphragm wall construction can be carried out smoothly in a large scale in Beijing area under the condition of complex strata and low space.Kandan Station of Beijing Metro Line 16,the Beixinqiao Station on the west side of the Capital Airport and the Guangqumenwai Station of Beijing Metro Line 7 had been chosen as representative cases.The Midas software was used to simulate the construction process of the diaphragm wall in the side pilot tunnel,revealing the environmental response induced by the construction of the underground diaphragm wall in the cave under the three typical stratum conditions of sandy cobble,silty clay and sand cobble-silty clay interbed in Beijing area.The results show these as follows.Under the same conditions,the surface settlement caused by diaphragm wall construction in sandy cobble stratum is the smallest,and that caused by diaphragm wall construction in silty clay stratum is the largest.The order of settlement value of pilot tunnel vault caused by diaphragm wall construction in the tunnel is:sandy cobble stratum<sandy cobble silty clay interbedded stratum<silty clay stratum.Compared with sandy cobble-silty clay stratum and silty clay stratum,the plastic strain value and strain range of surrounding rock caused by diaphragm wall construction in pilot tunnel are the smallest,that is to say,the disturbance to surrounding soil is smaller.

关 键 词:PBA(pile-beam-arc)工法 地下连续墙 沉降 地层效应 

分 类 号:U231.4[交通运输工程—道路与铁道工程]

 