EPC总承包模式下的项目进度偏差分析研究  被引量:2

An Analytical Study of Project Schedule Deviations under EPC Contracting Mode

在线阅读下载全文

作  者:李如春 吴刚 丁艺飞 LI Ru-chun;WU Gang;DING Yi-fei(Wuhuan Engineering Co.,Ltd.,Wuhan Hubei 430223,China)

机构地区:[1]中国五环工程有限公司,湖北武汉430223

出  处:《化肥设计》2022年第2期59-62,共4页Chemical Fertilizer Design

摘  要:项目进度管理是项目管理的一项重要工作,进度偏差是项目管理中最常见的的一种现象。进度偏差往往造成工程成本增加、工程质量下降和项目工期延长,最终给投资者造成经济损失。预防进度偏差需要分析造成进度偏差的根本原因。通过分析多个EPC案例统计的数据,对造成进度偏差的共性因素进行深入分析,并给出纠正偏差的应对措施。Project schedule management is an important part of project management,and schedule deviation is a most common phenomenon in project execution.Schedule deviations often lead to increase of project costs,decline of project quality,and extension of project duration,ultimately causing economic losses to investors.To prevent schedule deviations from happening,its root causes should be found out.In this paper,the statistical data of several EPC cases are analyzed to expose an in-depth view of the common factors behind schedule deviations,together with proposed countermeasures to correct these deviations.

关 键 词:EPC总承包 项目进度管理 进度偏差 

分 类 号:F426.7[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象