公路隧道机电设施主被动防凝露技术浅析  被引量:1

Analysis on Active and Passive Anti-condensation Technology of Electromechanical Facilities in Highway Tunnel

在线阅读下载全文

作  者:张彦晓[1] 石开荣 ZHANG Yanxiao;SHI Kairong(CCCC First Highway Consultants Co.,Ltd.,Xi'an Shaanxi 710065,China)

机构地区:[1]中交第一公路勘察设计研究院有限公司,陕西西安710065

出  处:《交通节能与环保》2022年第2期114-118,共5页Transport Energy Conservation & Environmental Protection

摘  要:本文针对隧道内凝露导致机电设备故障的问题,根据凝露的不同程度,提出隧道机电设施多种主被动防凝露措施。对比分析了主被动防凝露措施的优缺点,提出了各方案的应用范围。Aiming at the problem of tunnel mechanical and electrical equipment failure caused by condensation,according to the different degree of condensation,a variety of active and passive anti-condensation measures are put forward. The advantages and disadvantages of active and passive anti-condensation measures are compared and analyzed,and the application scope of each technology are put forward.

关 键 词:隧道机电 设施故障 主被动防凝露 除湿 

分 类 号:U453.7[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象