检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱文华 陈艳平 喻静 ZHU Wen-hua;CHEN Yan-ping;YU Jing(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2022年第4期187-190,共4页Yunnan Water Power
摘 要:围绕高扬程泵送混凝土施工的各项性能指标要求,介绍贵州省凯里市环城北段高速公路、清水江大桥箱梁高扬程泵送C55混凝土配合比室内试验以及现场施工配合比的调整与运用实践。通过清水江大桥C55箱梁的施工实践,经过140m垂直高度,270m水平距离泵送后,和易性、黏聚性均呈现良好,泵送顺畅,振捣容易,施工效果较好。Based on the performance index requirements of high-lift pumped concrete construction,this paper describes the indoor test of mix ratio of high-lift pumped C55 concrete for box girder and the adjustment and application practice of mix ratio in the north section of beltway and Qingshuijiang Bridge in Kaili.Through the construction practice of C55 box girder of Qingshuijiang Bridge,after 140 m vertical height and 270m horizontal distance pumped,the concrete shows good workability and cohesion.
关 键 词:高扬程 混凝土原材料 泵送混凝土配合比 施工实践
分 类 号:TV544[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222