检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘敏琦 王文超 李佳栋 罗浩 赖超 谢洪鑫 LIU Min-qi;WANG Wen-chao;LI Jia-dong;LUO Hao;LAI Chao;XIE Hong-xin(Yalong River Hydropower Development Company.Ltd.,Chengdu 610051,China)
机构地区:[1]雅砻江流域水电开发有限公司,四川成都610051
出 处:《云南水力发电》2022年第4期231-233,共3页Yunnan Water Power
摘 要:详细介绍了某水电站调速器油压装置自动补气装置改造投运后遇到的问题、原因及处理方法,并根据相应问题现象提出具体解决方法,包括动作逻辑优化,设备机械结构的优化等,保障了水电站调速器油压装置自动补气装置改造工作的顺利进行,为电站的安全稳定运行打下了坚实的基础。This paper describes in detail the problems encountered after the retrofit and operation of the automatic air supply device of the governor oil pressure device of a hydropower station,the causes and the treatment methods.In this paper,specific solutions are proposed based on corresponding problems,including action logic optimization,equipment mechanical structure optimization,etc.It guarantees the smooth progress of the retrofit of the automatic air supply device of the governor oil pressure device of the hydropower plant and lays a solid foundation for the safe and stable operation of the hydropower plant.
分 类 号:TK243.6[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248