地铁工程余泥渣土环境影响研究  被引量:7

ENVIRONMENTAL IMPACT EVALUATION OF RESIDUAL MUD FROM SUBWAY ENGINEERING

在线阅读下载全文

作  者:陈坤阳 王家远[1] 喻博 段华波 吴环宇[1] CHEN Kunyang;WANG Jiayuan;YU Bo;DUAN Huabo;WU Huanyu(College of Civil and Transportation Engineering,Sino-Australia Joint Research Center in BIM and Smart Construction,Shenzhen University,Shenzhen 518061,China;College of Civil and Transportation Engineering,Underground Polis Academy of Shenzhen University,Shenzhen University,Shenzhen 518061,China)

机构地区:[1]深圳大学土木与交通工程学院中澳BIM与智能建筑联合研究中心,广东深圳518061 [2]深圳大学土木与交通工程学院深圳大学未来地下城市研究院,广东深圳518061

出  处:《环境工程》2022年第2期191-198,共8页Environmental Engineering

基  金:国家自然科学基金(71772125);深圳市基础研究资助项目(JCYJ20160520173631894);基于GIS+BIM技术的集团级工程项目一体化智慧管理研究(ZTNF-KYKT-2019-02);深圳市科技创新委员会(JCYJ20190808123013260)。

摘  要:巨量的地铁工程余泥渣土在处置过程中会产生严重的环境影响。准确量化地铁工程余泥渣土的环境影响是对其进行有效管理的前提。为此,首先构建了地铁工程余泥渣土填埋占地量估算方法。其次,基于实地调研、半结构化访谈及文献综述,构建了地铁工程余泥渣土全生命周期碳排放评估方法。最后,以深圳地铁14号线为例,量化了余泥渣土的填埋占地量及其全生命周期碳排放。结果表明:深圳地铁14号线余泥渣土填埋处置的土地占用面积约为163.4万m^(2),将会产生4085万元的填埋费用;深圳地铁14号线余泥渣土全生命周期的CO_(2)排放量约为1.8E+07 kgCO_(2)eq。该研究结果可为政府部门科学制定地铁工程余泥渣土的管理政策提供理论方法及数据参考。A large amount of residual mud from subway engineering will have serious environmental impacts in the process of disposal. Accurately quantifying the environmental impacts of residual mud from subway engineering is the premise of effective management. In this study, firstly, the estimation method of the amount of land occupied by the residual mud landfill of the subway project was established. Secondly, based on field investigation, semi-structured interview and literature review, the life cycle carbon emission assessment method of residual mud from subway engineering was constructed. Finally, taking Shenzhen Metro Line 14 as an example, the amount of land occupied by landfill and its carbon emission in the whole life cycle were quantified. The results showed that: the land occupation area for landfill disposal of residual mud from Shenzhen Metro Line 14 was about 1.634 million m^(2), which would generate a landfill cost of 40.85 million yuan;the total life cycle CO_(2) emission of residual mud from Shenzhen metro line 14 was about 1.8 E+07 kgCO_(2)eq. The research results can provide a theoretical model and data reference for the government to scientifically formulate the management policy of the residual mud from subway engineering.

关 键 词:地铁工程余泥渣土 生命周期评价 碳排放 深圳地铁14号线 

分 类 号:U231[交通运输工程—道路与铁道工程] X799.1[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象