检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汪建新[1] 邵和平 吴启明 WANG Jianxin;SHAO Heping;WU Qiming(School of Mechanical Engineering,Inner Mongolia University of Science and Technology,Baotou 014010,China)
机构地区:[1]内蒙古科技大学机械工程学院,内蒙古包头014010
出 处:《工业加热》2022年第3期20-25,共6页Industrial Heating
摘 要:根据对步进式加热炉水梁漏水事故的分析,发现漏水位置均位于纵梁双管的上管与垫块连接的焊接端部。通过对多种原因分析排除,水梁漏水的原因是耐热垫块与水梁之间的焊接存在一定的缺陷,造成了水梁的应力集中;加上加热炉停炉过于频繁,加剧了水梁的疲劳损伤等几种因素叠加,最终导致水梁出现裂纹后漏水。通过改进两者之间的焊接工艺,提出了具体的改进方案,并通过数值模拟的方法进行验证。According to the analysis of the water leakage accident of the water beam of the walking heating furnace,it is found that the water leakage location is located at the welding end of the upper tube of the double pipe of the longitudinal beam and the spacer block.Through the analysis and elimination of various reasons,the cause of water leakage in the water beam is that there is a certain defect in the welding between the heat-resistant pad and the water beam,which causes the stress concentration of the water beam.In addition,the heating furnace is shut down too frequently,which intensifies the water flow.Several factors such as beam fatigue damage were superimposed,which eventually caused the water beam to leak after cracks.By improving the welding process between the two,a specific improvement plan was proposed and verified by numerical simulation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70