检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张昕 李柯 乔东宇 王学成 刘伟吉[2,3] 杜疆 杨睿 ZHANG Xin;LI Ke;QIAO Dongyu;WANG Xuecheng;LIU Weiji;DU Jiang;YANG Rui(CNPC West Drilling Engineering Technology Research Institute,Karamay,Xinjiang 834000,China;School of Mechanical and Electrical Engineering,Southwest Petroleum University,Chengdu,Sichuan 610500,China;Key Laboratory of Oil and Gas Equipment Ministry of Education,Chengdu,Sichuan 610500,China;Engineering Technology Research Institute of PetroChina Xinjiang Oilfield Company,Karamay,Xinjiang 834000,China)
机构地区:[1]中国石油西部钻探工程技术研究院,新疆克拉玛依834000 [2]西南石油大学机电工程学院,四川成都610500 [3]石油天然气装备教育部重点实验室,四川成都610500 [4]中国石油新疆油田公司工程技术研究院,新疆克拉玛依834000
出 处:《世界石油工业》2022年第2期54-60,共7页World Petroleum Industry
基 金:中国石油天然气集团有限公司重大科技专项“页岩油优快钻完井关键技术研究与应用”(2019E-2605)。
摘 要:深部钻探现已成为油气资源开发的主力,跳钻和屈曲问题限制了深井钻井效率。采用稳定器则能够缓解下部钻具的振动和变形问题,是提高钻井效率的有效手段之一。为了定量描述稳定器安装数量和间距对下部钻具组合的影响,基于Hamilton原理建立全井钻柱动力学模型并采用HHT-α法对模型求解,分析了稳定器对下部钻具组合屈曲、振动和跳钻的影响规律。研究结果表明:增加稳定器数量能够明显提高下部钻具组合的对中性并降低下部钻具的屈曲变形;使用两个稳定器能够缓解钻头轴向振动并有效控制钻头跳钻,且在较小间距(30 m)下安装两个稳定器能够进一步抑制钻头跳钻,从而提高钻头工作效率。研究结果为稳定器在现场的使用提供一定的理论数据支撑。Deep drilling is the main force in the development of oil and gas resources,and drilling efficiency of deep wells is limited by the problems of skip drilling and buckling.Stabilizer is one of the effective means to improve drilling efficiency,which can solve vibration and deformation problems of lower drilling tools.In order to quantitatively evaluate the influence of the number and spacing of stabilizers on the lower drilling rig combination,a dynamic model of full-well drilling string is established based on Hamilton principle and HHT-αmethod is used to solve the model and the influence of stabilizer on the combined buckling,vibration and jump of lower drilling tool is analyzed.The results show that:increasing the number of stabilizers can significantly reduce the buckling deformation of the lower drilling tool;The two stabilizers can more alleviate the axial vibration of the drill bit at a smaller installation interval;The two stabilizers can control drill bit tripping more effectively at a smaller installation interval.It is concluded that the efficiency of the two stabilizers is obvious when compared with a single stabilizer and basically the same when compared with several stabilizers.In addition,the installation of two stabilizers with a small distance(30 m)can better prevent the drill from jumping,thereby improving the working efficiency of the drill.
分 类 号:TE921[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.24.244