辛置煤矿充填开采可行性分析  被引量:2

Feasibility of Filling Mining in Xinzhi Coal Mine

在线阅读下载全文

作  者:赵志鹏 ZHAO Zhipeng(Huofen Coal Design Consulting Co.,Ltd.,Huozhou Coal Electricity Group,Huozhou 031400,Shanxi,China)

机构地区:[1]霍州煤电集团霍汾煤炭设计咨询有限责任公司,山西霍州031400

出  处:《能源与节能》2022年第4期152-154,共3页Energy and Energy Conservation

摘  要:为了延长辛置煤矿的服务年限,扩大矿井的可采资源储量,优化矿井的开采技术体系,基于已开采近70年的老矿井后备资源紧缺、衔接紧张、不能满足长远发展的不足,根据井田范围内村庄压煤较多,回收村庄下呆滞煤炭资源日显重要的现状,探索了辛置煤矿充填开采实施的可行性。辛置煤矿村庄压煤区域2^(#)煤层结构简单,属稳定-较稳定煤层,开采难度较小;采深在321~470 m之间,地表变形相对平缓,有利于地面建筑物的保护。2^(#)煤层至第三、四系含水层之间隔水层由泥岩、砂质泥岩组成,厚度较大,具有良好的隔水性能。矿井配套洗煤厂每年出矸石约1.0×10^(6) t,矸石来源广,周边有中国国电霍州发电厂、格盟国际能源山西兆光发电厂、南下庄水泥厂、临汾山水水泥厂等,可满足本区域建筑物下矸石、粉煤灰、水泥充填采煤的充填材料供应。探索分析表明,辛置煤矿可实现联采充填,从而更好地回收村庄下压煤资源,符合矿井发展规划。矿井联采充填可采出优质煤2.25×10^(7) t,预计创造1.80×10^(10)元的直接经济效益。In order to extend the service life of Xinzhi Coal Mine,expand the recoverable resource reserves of the mine and optimize the mining technology system of the mine,based on the deficiencies of the shortage of reserve resources,tight connection and unable to meet the long-term development of the old mine that has been mined for nearly 70 years,according to the current situation that there is more coal pressing in the villages within the mine field and the recovery of stagnant coal resources under the villages is becoming more and more important,this paper explored the feasibility of filling mining in Xinzhi Coal Mine.The village coal pressure area 2^(#) coal seam of Xinzhi Coal Mine has simple structure,belongs to stable-relatively stable coal seam,and the mining is less difficult;the mining depth is between 321-470 m,and the surface deformation is relatively gentle,which is conducive to the protection of ground buildings.The water resisting layer between the 2^(#) coal seam and the Tertiary and Quaternary aquifers is composed of mudstone and sandy mudstone with large thickness and good water resisting performance.The annual output of gangue from the supporting coal washing plant of the mine is about 1.0×10^(6) t,with a wide range of gangue sources,surrounded by China Guodian Huozhou Power Plant,Shanxi Zhaoguang Power Plant of Gemeng International Energy,Nanxiazhuang Cement Plant,Linfen Shanshui Cement Plant,etc.,which can meet the supply of filling materials for gangue,fly ash and cement filling coal mining under buildings in this area.The exploration and analysis show that Xinzhi Coal Mine can realize combined mining and filling,so as to better recover the coal resources under the village,which is in line with the mine development plan.The combined mining and filling of the mine can produce 2.25×10^(7) t high-quality coal,expect to create 1.80×10^(10) yuan direct economic benefits.

关 键 词:老矿井 村庄压煤多 解放呆滞煤炭资源 联采充填 

分 类 号:TD823.7[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象