大采高工作面停采期间冒顶原因分析及预防技术  被引量:1

Cause Analysis and Prevention Technology of Roof Fall During Stoping of Large Mining Height Face

在线阅读下载全文

作  者:胡鹏亮 Hu Pengliang(Heshan Coal Mine of Shanxi Coking Coal Fenxi Zhengxin Coal and Coke Company,Qinyuan Shanxi 046500)

机构地区:[1]山西焦煤汾西正新煤焦公司和善煤矿,山西沁源046500

出  处:《山西冶金》2022年第1期304-305,326,共3页Shanxi Metallurgy

摘  要:综采工作面回采至停采线位置时需要有序回撤综采设备,若采面停采期间顶板出现冒落不仅会影响综采设备正常回撤而且存在一定的安全风险。文中对造成6205综采工作面停采位置顶板冒落原因进行分析,并提出一些针对性预防措施,以期能够为后续大采高综采工作面顶板冒落事故治理以及预防工作开展提供经验借鉴。The fully mechanized mining equipment needs to be withdrawn orderly when the fully mechanized mining face is stoped to the stop line. If the roof falls during stoping, it will not only affect the normal withdrawal of fully mechanized mining equipment, but also have certain safety risks. This paper analyzes the causes of roof caving at the stoping position of 6205 fully mechanized mining face, and puts forward some targeted preventive measures, in order to provide experience for the treatment and prevention of roof caving accident in large mining height fully mechanized mining face.

关 键 词:大采高工作面 停采线 顶板岩层 冒落 预防技术 围岩支护 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象