检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒙学礼 李涣森 刘振龙 MENG Xueli;LI Huansen;LIU Zhenlong(The Fourth Geological Team of Guangxi Zhuang Autonomous Region,Nanning 530033,Guangxi,China;Guangxi First Geological Engineering Company,Nanning 530033,Guangxi,China)
机构地区:[1]广西壮族自治区第四地质队,广西南宁530033 [2]广西第一地质工程公司,广西南宁530033
出 处:《资源信息与工程》2022年第2期29-32,共4页Resource Information and Engineering
摘 要:本文以南宁市伶俐工业园区建设用地地质灾害危险性评估为例,确定评估区范围,综合分析项目建设用地地质环境条件,对现状和潜在的地质灾害进行现状评估、预测评估,以及综合分区,提出了南宁市伶俐工业园区建设用地地质灾害的防治措施。Taking geologic hazard assessment of Nanning Lingli Industrial Park as an example,this paper determined the range of the assessment area,comprehensively analyzed geological environmental conditions of the project construction land,evaluated current and potential geological hazards,zoned comprehensively,and put forward prevention and control measures for construction land of Nanning Lingli Industrial Park.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28