检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:潘旭[1] PAN Xu(No.6 Oil Production Plant of Daqing Oilfield)
机构地区:[1]大庆油田有限责任公司第六采油厂
出 处:《石油石化节能》2022年第4期24-28,I0005,I0006,共7页Energy Conservation in Petroleum & PetroChemical Industry
摘 要:根据现场调研,大庆油田注水系统采用注水站—配水间—单井的建设模式,其中配水间采用人工单井调控方式,配水间存在着注水精度不够、夜间注水无人监控、注水误差大等问题,影响精细注水要求。针对此问题,依据配水间的建设情况,提出配水间自动调控技术,采用高压流量控制装置,调整现场注水量,并在现场开展试验应用,选择流量波动较大,注水效果较差的配水间进行试验,并多时段跟踪测试、验证效果,设备使用后,控制精度提升53.57%,控制效果良好,单井可节约水量14.46 m^(3),可实现单井节约费用3.54万元。According to the field investigation,the water injection system in Daqing oilfield adopts the construction mode of water injection station,water distribution room and single well,in which the water distribution room adopts the artificial single well regulation mode.There are some problems in the water distribution room,such as insufficient water injection precision,no monitoring of water injection at night,and large water injection error,which affect the requirements of fine water injection.Aiming at this problem,according to the situation of water distribution between construction,put forward water distribution between automatic control technology,using high pressure flow control device,adjusting the water injection,and to carry out the test in site application,choose the flow fluctuation is bigger,the water injection effect experiment of poor water injection,and more time tracking test,verify the effect,after equipment use,53.57%increase control precision,The control effect is good,the water can be saved by 14.46 m3 per well,and the cost can be saved by 35400 yuan per well.
分 类 号:TE357.6[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249