检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周生强 田锦标 ZHOU Shengqiang;TIAN Jinbiao(China Railway Changjiang Transport Design Group Co.,Ltd.,Chongqing 400000)
机构地区:[1]中铁长江交通设计集团有限公司,重庆400000
出 处:《公路交通技术》2022年第2期58-65,共8页Technology of Highway and Transport
摘 要:为缓解渝湘高速公路日益增长的交通压力,加快沿线区县旅游资源一体化开发,解决武隆隧道群通行能力不足、运营安全风险高的问题,在交通运输需求分析的基础上,结合地形地质,提出了多个路线方案,并针对设计速度进行了综合分析,确定了120 km/h、100 km/h、80 km/h设计速度的分段建设标准及北中南3个走廊。In order to alleviate the increasing traffic pressure of Chongqing-Hunan Expressway,speed up the integrated development of tourism resources in the districts and counties along the expressway,and solve the problems of insufficient capacity and high operation safety risk of Wulong tunnel group.Based on the analysis of traffic demand and combined with topography and geology,several route schemes are put forward,and the design speed is comprehensively analyzed,and the sectional construction standards of 120 km/h,100 km/h and 80 km/h design speed and three corridors of north,middle and south are determined.
关 键 词:渝湘高速 规划研究 方案研究 交通运输需求分析 现有高速公路扩能
分 类 号:U412.32[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.154.109