垃圾焚烧发电厂渗滤液处理系统工程设计实例分析  被引量:1

Case Analysis of Engineering Design of Leachate Treatment System in Waste Incineration Power Plant

在线阅读下载全文

作  者:苏间梨 SU Jianli(Guangzhou Zhengyu Environmental Protection Technology Co.,Ltd.,Guangzhou 510000,China)

机构地区:[1]广州正禹环保科技有限公司,广州510000

出  处:《中国资源综合利用》2022年第4期198-201,共4页China Resources Comprehensive Utilization

摘  要:本文以肇庆市高要区某垃圾焚烧发电厂为例,通过“预处理+厌氧处理+A/O+UF+TUF化学软化+RO+DTRO”组合工艺对渗滤液进行处理,并将渗滤液处理后的出水回用作为循环冷却水补充水。监测结果显示,该渗滤液处理后,出水达到国家相关标准要求,具有较好的环境效益。本项目能够为其他垃圾焚烧发电厂的渗滤液处置提供参考。Taking a waste incineration power plant in Gaoyao District,Zhaoqing City as an example,this paper treats the leachate through the combined process of "pretreatment + anaerobic treatment + A/O + UF + TUF chemical softening + RO + DTRO",and reuses the effluent after leachate treatment as the supplementary water of circulating cooling water.The monitoring results show that after the leachate is treated,the effluent meets the relevant national standards and has good environmental benefits.This project can provide a reference for the leachate disposal in other waste incineration power plants.

关 键 词:渗滤液 DTRO TUF化学软化 

分 类 号:X703[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象