检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭凌 舒畅 张函 王河 刘鸿宾 GUO Ling;SHU Chang;ZHANG Han;WANG He;LIU Hong-bin(Gas Branch Plant of Energy Control Center of Angang Steel Co.,Ltd.,Anshan 114021)
机构地区:[1]鞍钢股份能源管控中心燃气分厂,鞍山114021
出 处:《冶金设备管理与维修》2022年第2期43-45,48,共4页Metallurgical Equipment Management and Maintenance
摘 要:针对转炉煤气回收过程中存在的问题,通过对煤气柜回收工艺进行调整、优化,最大限度地利用了转炉煤气柜容,解决了因生产节奏变化大造成柜满拒收的现象,同时对故障率高、影响回收的设备进行改造,减少了停柜检修时间,增加了转炉煤气回收量。Aiming at the problems in the process of converter gas recovery,the tank capacity is used to maximum through adjusting and optimizing the recovery process of the gas tank.The phenomenon of rejecting gas by full tank is solved,resulted from big production pace change.Meanwhile,the equipments with high fault rate and recovery influence are modified.Maintenance,time is decreased and the amount of recovery gas is increased.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7