检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:夏焰坤 任俊杰 XIA Yankun;REN Junjie(School of Electrical and Electronic Information Engineering, Xihua University, Chengdu 610039, Sichuan, China)
机构地区:[1]西华大学电气与电子信息学院,四川成都610039
出 处:《四川电力技术》2022年第2期82-86,共5页Sichuan Electric Power Technology
基 金:四川省科技计划项目(2020YFG0184)。
摘 要:电气化铁路因其供电能力强、速度快、安全高效,在国内外得到快速发展,但川藏铁路目前存在三相电力供电能力弱、电能质量难以达到国家标准要求等问题。针对高原铁路存在的问题,提出了一种基于组合式变换器贯通供电方案。首先,分析了系统结构和原理;其次,采用Matlab仿真软件进行3个变电所的建模仿真。仿真结果表明,基于组合式变换器的贯通供电系统主要电气性能均能达到国家标准要求,仿真结果证实所提方法的有效性。Electrified railways have developed rapidly at home and abroad due to their strong power supply capacity,fast speed,safety and efficiency,but Sichuan-Tibet railways currently have problems such as weak three-phase power supply capacity and its power quality is difficult to achieve the national standard requirements.Aiming at the existing problems of plateau railways,a through power supply scheme based on combined converters is proposed.Firstly,the system structure and principle are analyzed,and then the Matlab simulation software is used to model and simulate three substations.The simulation results show that the main electrical performance of the through power supply system based on combined converters can meet the national standard requirements,and the results confirm the effectiveness of the proposed method.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15