软土地区超高层建筑新型桩基与深基础沉降控制关键技术及应用  被引量:6

Key Technology and Application for Settlement Controlling of New Pile Foundation and Deep Foundation of Super High-rise Buildings in Soft Soil Area

在线阅读下载全文

作  者:王卫东[1] 吴江斌[1] 李耀良 周建龙[1] 梅国雄[3] 常林越[1] 陈锦剑[4] 周蓉峰 余地华 凡后奇 包联进[1] 宋青君[1] 李永辉[8] 王阿丹 黄昱挺 Wang Weidong;Wu Jiangbin;Li Yaopliang;Zhou Jianlong;Mei Guoxiong;Chang Linyue;Chen Jinjian;Zhou Rongfeng;Yu Dihua;Fan Houqi;Bao Lianjin;Song Qingjun;Li Yonghui;Wang Adan;Huang Yuting(East China Architecture Design&Research Institute Co.,Ltd.,Shanghai,200011;Shanghai Foundation Engineering Group Co.,Ltd.,Shanghai,200002;Nanjing Tech University,Nanjing,211816;Shanghai Jiaotong University,Shanghai,200240;Shanghai Mechanized Construction Group Co.,Ltd.,Shanghai,200436;China Construction Third Engineering Bureau Group Co.,Ltd.,Wuhan,430064;Shanghai Guanglian Environmental Geotechnical Engineering Co.,Ltd.,Shang-hai,200444;Zhengzhou University,Zhengzhou,450001)

机构地区:[1]华东建筑设计研究院有限公司,上海200011 [2]上海市基础工程集团有限公司,上海200002 [3]南京工业大学,南京211816 [4]上海交通大学,上海200240 [5]上海市机械施工集团有限公司,上海200436 [6]中建三局集团有限公司,武汉430064 [7]上海广联环境岩土工程股份有限公司,上海200444 [8]郑州大学,郑州450001

出  处:《建设科技》2022年第7期75-77,105,共4页Construction Science and Technology

摘  要:项目组针对我国软土地区超高层建筑新型桩基与深基础沉降控制的建设需求,通过系统的技术研发与创新,创建了超长灌注桩设计施工与检测关键技术,研发了扩底抗拔桩和桩侧后注浆抗拔桩新技术,首次系统地开展了软土地区十余项高度200~600m超高层建筑基础沉降全过程实测研究,系统地建立了超高层建筑深基础沉降分析方法与沉降控制关键技术。该成果已在国内十余个地区逾五十项超高层建筑中得到成功应用,代表性项目包括天津117大厦(597m)、上海中心大厦(632m)、武汉中心大厦(438m)、武汉绿地中心(475m)、天津津塔(336.9m)、上海白玉兰广场(320m)等,为我国超高层建筑的建造提供了有力的技术支撑。The construction requirements of new type of pile foundation and the deep foundation settlement controlling tech-nique of super high-rise buildings in soft soil areas in China has increased in past several decades.Based on systematic inves-tigation and innovation,the project team has developed a series of innovative technology of design,construction and detection techniques of super long cast-in-place pile,and invented a new technique of belled uplift pile and post grouting uplift pile on pile side.The characteristics of entire foundation settlement process for more than ten super high-rise buildings with a height of 200~600m in soft soil area have been carefully monitored and investigated for the first time.A new deep foundation settle-ment analysis method and settlement controlling techniques for super high-rise buildings are systematically established.The new method and techniques have been successfully applied in design and construction of more than fifty super high-rise build-ings in more than ten districts in China,including Tianjin 117 Plaza(597m),Shanghai Center Tower(632m),Wuhan Center Tower(438m),Wuhan Greenland Center(475m),Tianjin Tower(336.9m),Shanghai Magnolia Plaza(320m),etc.,providing solid technical supports for the construction of super high-rise buildings in China.

关 键 词:超高层建筑 深基础 软土 超长灌注桩 扩底抗拔桩 桩侧后注浆抗拔桩 沉降分析方法 沉降控制技术 

分 类 号:TU753.3[建筑科学—建筑技术科学]

 