桥梁高墩工程施工中爬模工艺与滑模工艺的对比研究——以南榨河大桥空心薄壁墩专项施工工程为例  被引量:11

Comparative Study on Climbing Formwork Process and Sliding Formwork Process in the Construction of Bridge High Piers ——Taking the Special Construction Project of Hollow Thin-walled Piers of Nanzhahe Bridge as an Example

在线阅读下载全文

作  者:汤慧 Tang Hui(The 4th Construction Company Ltd.of China 15th Corporation,Zhengzhou,Henan 451100)

机构地区:[1]中铁十五局集团第四工程有限公司,河南郑州451100

出  处:《工程技术研究》2022年第5期76-78,共3页Engineering and Technological Research

摘  要:滑模工艺与爬模工艺均是桥梁高墩施工中的关键施工技术,二者在实际施工中的表现各具优势,也存在一定的不足。鉴于此,文章以南榨河大桥空心薄壁墩专项施工工程为例,从施工工艺、施工质量、施工安全、施工工期和经济效益等方面对比研究滑模工艺和爬模工艺的应用效果,以期能够选择最佳的施工方式,提高桥梁高墩施工的质量。Sliding formwork process and climbing formwork process are the key construction technologies in bridge high pier construction.Both of them have advantages and disadvantages in actual construction.In view of this,this paper takes the special construction project of hollow thin-walled piers of Nanzhahe Bridge as an example,and compares and studies the application effect of sliding formwork process and climbing formwork process from the aspects of construction technology,construction quality,construction safety,construction period and economic benefit,so as to select the best construction method and improve the quality of bridge high pier construction.

关 键 词:桥梁高墩工程 爬模工艺 滑模工艺 施工成本 

分 类 号:U445.559[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象