浅海滩涂地区高桩承台吊箱法施工关键技术研究——以杭甬高速复线宁波一期工程滨海高架桥施工为例  

Research on Key Construction Technology of High Pile Cap with Hanging Box Method in Shallow Tidal Flat Area——Taking the Construction of the Coastal Viaduct in the First Phase of Hangzhou-Ningbo Expressway Double-line Project as an Example

在线阅读下载全文

作  者:王博 叶宁波 黄伟 王涛 孙立斌 Wang Bo;Ye Ningbo;Huang Wei;Wang Tao;Sun Libin(Zhejiang Hangzhou-Ningbo Double-line Ningbo Phase I Expressway Co.,Ltd.,Ningbo,Zhejiang 315100;The 2nd Construction Co.,Ltd.of China Railway Construction 15th Group,Shanghai 201713)

机构地区:[1]浙江杭甬复线宁波一期高速公路有限公司,浙江宁波315100 [2]中铁十五局集团第二工程有限公司,上海201713

出  处:《工程技术研究》2022年第6期1-7,共7页Engineering and Technological Research

摘  要:浅海滩涂地区每日涨落潮水位差大,流塑性强的淤泥层厚,导致桥梁大尺寸承台施工困难。对此,文章以杭甬高速复线宁波一期工程项目滨海高架桥高桩承台施工为例,从钢吊箱设计、钢吊箱安装、承台冷却管安装、承台混凝土浇筑及养护施工、吊箱拆除几个方面对浅海滩涂地区高桩承台吊箱法施工技术进行了详细的阐述,以供参考。In the shallow tidal flat area,the daily ebb and flow water level difference is large,and the silt layer with strong flow plasticity is thick,which makes the construction of large-scale bridge caps difficult.In this regard,this paper takes the construction of high pile cap of the coastal viaduct in the first phase of Hangzhou-Ningbo Expressway double-line project as an example,and expounds the construction technology of high pile cap with hanging box method in shallow tidal flat area from the aspects of steel box design,steel box installation,cap cooling pipe installation,cap concrete pouring and maintenance construction,and hanging box removal in detail for reference.

关 键 词:浅海滩涂地区 高桩承台 吊箱法 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象