检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:闫逵 Yan Kui(Urban Rail Transit Engineering Co.,Ltd.of China Railway Beijing Engineering Group,Hefei,Anhui 230061)
机构地区:[1]中铁北京工程局集团城市轨道交通工程有限公司,安徽合肥230061
出 处:《工程技术研究》2022年第6期41-44,共4页Engineering and Technological Research
摘 要:盾构既在长大坡度,又在小曲线段上掘进是西安地铁面临的一个全新的重难点课题,对施工的安全和质量提出了更高的要求。对此,文章以西安地铁4号线工程D4TJSG-3标段为例,首先详细叙述了盾构在长大坡度小曲线段掘进过程中的风险,然后通过新旧始发方案的经济性对比,提出了相应的施工控制技术及难题的解决方法,能为后续盾构施工类似工程提供参考。Shield tunneling in both long slope and small curve sections is a new and difficult task faced by Xi’an Metro,which puts forward higher requirements for construction safety and quality.In this regard,this paper takes the D4TJSG-3 bid section of Xi’an Metro Line 4 project as an example.Firstly,the risks of shield tunneling in the small curve section with large slope are described in detail.Then,through the economic comparison of the old and new launching schemes,the corresponding construction control technology and the solutions to the problems are proposed,which can provide references for similar projects in subsequent shield construction.
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28