检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王勇 Wang Yong(Guizhou Engineering Company of China Railway NO.5 Engineering Group Co.,Ltd.,Guiyang,Guizhou 550000)
机构地区:[1]中铁五局集团贵州工程有限公司,贵州贵阳550000
出 处:《工程技术研究》2022年第6期48-51,共4页Engineering and Technological Research
摘 要:大管径市政管网穿越施工需要将对周围环境的影响降至最低。文章依托花溪湖水务工程,介绍了水平定向钻进施工工艺,分析其对周围土层和构造物、水环境、声环境的影响,进而提出了相应的控制措施,并在此基础上进行了施工适用性、工期、成本效益评价。Large diameter municipal pipe network crossing construction needs to minimize the impact on the surrounding environment.Based on the Huaxi Lake Water Project,this paper introduces the horizontal directional drilling construction technology,analyzes its influence on the surrounding soil layer and structure,water environment and acoustic environment,and puts forward the corresponding control measures.Meanwhile,the construction applicability,construction period and cost-effectiveness are evaluated on this basis.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33