检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄海燕 Huang Haiyan(Anhui Agricultural University,Hefei,Anhui 230036)
机构地区:[1]安徽农业大学,安徽合肥230036
出 处:《江西建材》2022年第4期51-52,共2页Jiangxi Building Materials
摘 要:某工程项目主体结构部分框架柱表面存在大量的蜂窝麻面、裂缝以及混凝土强度未达到设计强度标准的问题,经专家论证后,决定对现场部分框架柱采取整体置换措施,从而使其加固后满足设计要求。文中结合实际工程,分析了导致框架柱强度不足的原因及处理办法,希望为类似项目提供一定参考。In view of the fact that there are a large number of honeycomb hemp surfaces, cracks and concrete strength on the surface of part of the frame column of the main structure of an engineering project, and the strength of concrete does not meet the design strength standard.After the experts’ demonstration, it is decided to take the overall replacement measures for part of the frame on the spot, so that the design requirements can be met after reinforcement. Combined with the actual project, this paper analyzes the causes and treatment methods of the lack of strength, hoping to provide some reference for similar projects.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90