检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高志超 Gao Zhichao(Jinggong No.3 Mine of China Coal Pingshuo Group Co.,Ltd.,Shuozhou Shanxi 036006)
机构地区:[1]中煤平朔集团有限公司井工三矿,山西朔州036006
出 处:《山西冶金》2022年第2期77-78,84,共3页Shanxi Metallurgy
摘 要:平朔井工三矿9煤赋存条件差、地质构造较多,掌握9煤巷道围岩地质力学参数是实现本煤层巷道锚杆支护可靠性及合理性的基础,基于此,对井工三矿9煤巷道围岩地质力学参数进行原位测试及分析,为井工三矿9煤巷道支护设计提供技术保障。No.9 coal seam in No.3 mine of Pingshuo Mine has poor occurrence conditions and many geological structures.Mastering the geomechanical parameters of surrounding rock of No.9 coal seam roadway is the basis for realizing the reliability and rationality of roadway bolt support in this coal seam.In this paper,the geomechanical parameters of surrounding rock of 9 coal roadway in Jinggong No.3 mine are tested and analyzed in-situ,so as to provide technical guarantee for the support design of 9 coal roadway in Jinggong No.3 mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28