优化煤气调配挖掘发电潜力的实践探讨  

Optimizing Gas Allocation and Tapping Power Generation Potential

在线阅读下载全文

作  者:史志杰 王志峰[1] 宋亚非[1] Shi Zhijie;Wang Zhifeng;Song Yafei(Power Plant of Anyang Iron and Steel Co.,Ltd.,Anyang Henan 455000)

机构地区:[1]安阳钢铁股份有限公司动力厂,河南安阳455000

出  处:《山西冶金》2022年第2期221-223,共3页Shanxi Metallurgy

摘  要:钢铁冶金企业利用副产煤气发电来降低购电成本,产生经济效益。根据发电机组的效率不同及分时电价,优化煤气调配中存在的一些问题,挖掘发电潜力,提高发电量,增加发电机组在电价高峰段的发电效益,提高钢铁厂二次能源利用率。Iron and steel metallurgical enterprises use by-product gas to generate electricity,reduce powerpurchase cost and produce economic benefits.According to the different efficiency of generator units and time of use electricity price,this paper optimizes some problems existing in gas allocation,taps the power generation potential,improves the power generation capacity,increases the power generation efficiency of generator units at the peak of electricity price,and improves the secondary energy utilization rate of iron and steel plant.

关 键 词:煤气 调配 错峰发电 

分 类 号:TF089[冶金工程—冶金物理化学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象