矿井特大型贯通测量工作探析  

Study on the Work of Super Large Through Survey in Mine

在线阅读下载全文

作  者:赵毅彪 Zhao Yibiao(Jinneng Holding Coal Group Majiliang Mine,Datong Shanxi 037003)

机构地区:[1]晋能控股煤业集团马脊梁矿,山西大同037003

出  处:《山西冶金》2022年第2期377-379,共3页Shanxi Metallurgy

摘  要:为促进煤矿特大型贯通测量工作安全快速进行,基于煤矿特大型贯通测量时普遍存在的施工难度大、时间紧、任务重、测量精度要求高等特点,探讨了特大型贯通测量前的主要准备工作以及贯通测量方案设计,同时结合现代测绘新技术,提出一些方便可行的贯通测量施工方法,并结合晋能控股煤业集团近年来的部分大型贯通案例,总结出一些保障煤矿特大型贯通测量工作安全快速顺利进行的措施,以期为类似工况下的煤矿特大型贯通测量工作提供一定的技术支持。In order to promote the safe and rapid progress of super large through survey in coal mine,based on the common characteristics of large construction difficulty,tight time,heavy task and high measurement accuracy requirements in super large through survey in coal mine,this paper discusses the main preparations before super large through survey and the design of through survey scheme,and puts forward some convenient and feasible through survey construction methods combined with new modern surveying and mapping technology.Combined with some large-scale penetration cases of Jinneng Holding Coal Industry Group in recent years,this paper summarizes some measures to ensure the safe,rapid and smooth progress of coal mine large-scale penetration survey,so as to provide some technical support for coal mine large-scale penetration survey under similar working conditions.

关 键 词:煤矿 大型贯通 测量方案 施工方法 安全措施 

分 类 号:TD175[矿业工程—矿山地质测量]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象