检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王龙 WANG Long(Hexie Coal Industry Co.,Ltd.,Jinneng Holding Coal Industry Group,Yangquan 045000,Shanxi,China)
机构地区:[1]晋能控股煤业集团和谐煤业有限公司,山西阳泉045000
出 处:《能源与节能》2022年第5期167-169,共3页Energy and Energy Conservation
摘 要:为了提高煤炭资源的回采率和缓解采掘接替紧张,采用了无煤柱开采技术。在无煤柱开采技术中,切顶卸压沿空成巷无煤柱开采是目前广泛应用的主流技术。分析了切顶卸压沿空成巷无煤柱开采技术的关键内容,主要是巷道恒阻锚索支护和定向预裂切顶,并分析了该技术在山西A矿的应用。切顶卸压沿空成巷无煤柱开采技术的应用,不仅提高了煤炭资源回收率,还降低了成本,缓解了采掘接替紧张。In order to improve the recovery rate of coal resources and relieve the tension of mining and tunnelling replacement,the non-pillar mining technology is adopted.In non-pillar mining technology,non-pillar mining technology of top-cutting pressure relief roadway formed along gob widely used at present.This paper analyzedthe key content of non-pillar mining technology of top-cutting pressure relief roadway formed along gob,mainly including roadway constant resistance anchor cable support and directional pre-split roof cutting,and analyzed the application of this technology in A Mine of Shanxi.The application of non-pillar mining technology of top-cutting pressure relief roadway formed along gob can not only improve the recovery rate of coal resources,but also reduce the cost and relieves the tension of mining and tunnelling.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.12.160