高拱坝封拱接触灌浆施工技术  被引量:1

Construction Technology of Contact Grouting for Joint Closure of High Arch Dam

在线阅读下载全文

作  者:陈进辉 CHEN Jin-hui(Yunnan Water Diversion Project Construction Administration,Kunming 650000,China)

机构地区:[1]云南省滇中引水工程建设管理局,云南昆明650000

出  处:《云南水力发电》2022年第5期97-100,共4页Yunnan Water Power

摘  要:对于拱形坝,两坝段之间的横缝都要进行灌浆,灌浆后各个坝块连接成一个整体,起整体拱的作用。详细介绍拱坝接缝接触灌浆全过程,对灌浆技术进行分析总结,该拱坝的成功封拱灌浆技术,保证电站尽早蓄水发电,提高了经济效益。采用橡胶拔管,具有质量可靠、经久耐用的优点。For arch dams,grouting is required for the transverse joints between the two sections.After grouting,each dam block is connected as a whole and acts as an integral arch.In this paper,the whole process of contact grouting for arch dam joint is introduced in detail,and grouting technology is analyzed and summarized.The joint closure sealing grouting technology of the arch dam guarantees that the power plant can store water and generate electricity as soon as possible and improves economic benefits.This technology uses rubber tube pulling and has the advantages of reliable quality and durability.

关 键 词:高拱坝 封拱 接触 灌浆 

分 类 号:TU5431[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象