刚果(金)某大型铜钴矿磨矿工艺优化研究  被引量:1

Research on optimization of grinding process of a large copper-cobalt mine in D R Congo

在线阅读下载全文

作  者:兰川 刘佳鹏 徐敬元 董宏军 杨军 周统中 LAN Chuan;LIU Jiapeng;XU Jingyuan;DONG Hongjun;YANG Jun;ZHOU Tongzhong(Norin Mining Limited,Beijing 100053,China)

机构地区:[1]北方矿业有限责任公司,北京100053

出  处:《矿山机械》2022年第5期30-34,共5页Mining & Processing Equipment

摘  要:刚果(金)某大型铜钴矿项目碎磨系统设计为SAB流程,自投产以来出现系统处理量波动大、球磨机运行负荷率过低、旋流器及球磨机循环负荷重、钢球单耗偏高等问题。为此对磨矿工艺进行了详细的流程考察,利用JKSimMet仿真软件分析流程考察数据认为,矿石硬度波动大、半自磨出料圆筒筛堵塞、球磨机循环负荷大是主要原因,进而有针对性地提出了系统工艺优化和技术改造建议。The comminution system of a large copper-cobalt mine in D R Congo was designed as SAB circuit,it had undergone the problems such as large throughput fluctuation,over-low operating load ratio of the ball mill,heavy circulating load of the cyclone and the ball mill,high specific consumption of the steel ball etc since put into use.Therefore,the grinding process was surveyed in detail.The analysis results with the aid of JKSimMet simulation software indicated the large fluctuation of ore hardness,the blockage of the trommel behind the SAG mill and the heavy circulating load of the ball mill were the main causes,and the targeted suggestions about optimization of the system operation and technical innovation were put forward.

关 键 词:磨矿工艺 碎磨流程 半自磨机 球磨机 工艺优化 

分 类 号:TD453[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象